Bathroom Vanity & Sink Installation
Location: 2356 Chesterfield Ave North Vancouver Bc V7M 2R1 Canada
Project Details
Installed a new bathroom vanity with integrated sink and faucet. Modified and re-routed the existing drain and water supply rough-ins to match the new vanity layout, including extending and aligning the plumbing connections hidden behind the wall. Completed final drain assembly, water line connections, fixture installation, and leak testing to ensure proper operation and a clean finished appearance.
Services Performed:
Removed and modified existing plumbing rough-ins
Extended drain and water supply connections
Installed new vanity, sink, and faucet
Connected P-trap and shut-off valves
Leak tested all plumbing connections
Final alignment and finishing adjustments
Photo Gallery
Project Location
2356 Chesterfield Ave North Vancouver Bc V7M 2R1 Canada